In 2011, Chroma Energy Group served as the developer and EPC contractor for two 1 MW solar PV ground-mounted and concrete-ballasted installations. At the time of their installation, these were the largest PV solar installations in the state of Tennessee. Construction for each of these projects took less than three months and the installations exceeded Natural Energy Group’s power production requirements.